Revised Documents posted for Sunpin Solar project

Current Documents for Sizer Drive Proposal

These  documents are current as of July 29,  2021 for the proposed Solar facility at 40 Sizer Drive. Some of these were posted in March and April.

1. Original NOI 2019 (Andrews  Engineering)

2 Sunpin Ammended NOI (Woods Engineering)

3. Shade analysis (Woods)

4. Revised Form 3 (NOI)

5. Sunpin StormWater Management April 2021 (Woods)

6. Sunpin SWPPP April 2021 (Woods)

7. Sunpin Plans -Engineering Drawings June 2021 (Woods)