Well Information

Installation of new wells requires an application and approval of the site prior to installation. All fees must be paid at the time of application. Approval may take up to 21 days. Please locate all septic systems within a 100' radius of the proposed well and provide a drawing showing location and distance to septic systems from proposed well. All setback criteria must be met if possible. If setbacks cannot be met, an application for variance must be submitted and evaluated at the next Board of Health meeting.

AttachmentSize
Microsoft Office document icon well_permit_application_2018.doc4.39 MB